ASD has recently
designed,
manufactured,
installed and
commissioned a Fully
Automated Three
Phase Transformer
Test System /
TLS-300A for CLP-Honk
Kong.
TLS300-A is capable
of testing
transformers up to
2500KVA and
performing the
following tests
according to ANSI /
IEC standards, in
one test station
connection to the
low voltage and high
voltage windings:
No-Load
Losses Test
Load
Losses Tests
Induced Test
Applied test for Primary / Secondary
Winding Resistance Test
Ratio Test
Insulation Resistance
Demagnetization
Heat Run Test
Partial Discharge Test
The system provides
fully automated
sequential test mode
in addition to
manual walk through
mode for special and
other testing
purposes. The
operator has full
control over the
operation and
testing progress.
Test Results are
saved to database
and reports easily
generated.
The system
is a combination of
powerful hardware
and user friendly
software effectively
interacting to
ensure accuracy,
reliability and
safety.
TLS300-A integrates
different levels of
hardware and
software protection
features.
The software
provides graphical
test panels
indicating. test
progress and live
measurements, in
addition to system
configuration and
diagnostic panels as
well.
The operator
interface is
available in English
and other languages.
Users can switch
between languages
through click of a
button.
ASD has designed,
manufactured,
installed and
commissioned
numerous transformer
test systems for
small, medium and
large power
transformers.
|