OVERVIEW
Connector testing is
achieved is as
described.
For a defined On
Time resembling
heating cycle, Ac
current is supplied
and temperature is
measured on
connectors in
addition to ambient
and control
temperature. Again
for a defined Off
Time resembling
cooling cycle, DC
current is supplied,
voltage across three
points around
connector are
measured (va,vb,vc),
knowing the current,
three resistances
are calculated for
each connector (Rab,
Rbc, Rac). Connector
temperature
measurement is
determined as well.
A rugged controller
designed by ASD
holds control over
the system’s
hardware function
and communication
between hardware and
software on PC.
Measurements are
read and manipulated
by software through
hardware and via
controller.
|