ASD has performed Hipotronics
upgrade, Biddle
upgrade and other three
phase
transfomer test systems
upgrade
for several
utilities and
municipality
utilities. Since
transformer losses
contribute to as
much as 25% of the
total losses in
power distribution
systems; test
systems are a
necessity and
upgrading existing
test systems can be
a consistent option
as purchasing a new
one.
ASD has applied such
systems for
Gulf Power-Florida,
Georgia
Power-Atlanta,
Alabama
Power-Alabama, City
of Concord-Concord,
Public Works
Commission-Fayetteville.